Thursday, 12 July 2012

Making Agile Go Fast

Just recently I was speaking with a potential customer who had concerns about the velocity of their Scrum teams. They had recently (9 months ago) switched to an agile approach and had expected to get much more delivered than they had.

Now they were looking in to scaling up the number of Scrum teams on the project to try and increase velocity and deliver more quickly. In my experience of many agile projects, increasing the number of people on the project, especially one that is struggling, never has the desired effect of making things go faster. The advice to this customer was to therefore look at making their existing teams and process more effective rather than increasing the number of people on the project.

This got me thinking about what makes agile projects go slow. Across a number of projects that I have experienced, I’ve identified four common traits: two related to people and process and two related to technical concerns.

The Wrong People

Agile is all about using the right people. In fact this is true for any project or process, but for agile it is even more important. Use the right people and the agile process will work. Use the wrong ones and you will struggle.

The people who you don’t want on your agile project are those who are not disciplined enough to follow sound engineering practices and those who try to build complex frameworks/toolkits and who conduct personal science projects on your codebase. If you want to go fast then it’s vital that you have a clean, simple and well-refactored codebase that is backed up by a set of quality tests. Team members who don’t support this vision slow down the whole team.

To get back on track, remove those devs who aren’t following good engineering discipline and those who keep making things more complex. Bring in experienced agile developers to pair with the remaining team, giving them the responsibility of ensuring quality engineering practices are followed.

Putting The Process First

Another common mistake of companies starting out with agile projects is that they assume the process will make them go faster. Sorry to disappoint, but this is just not true. What makes agile teams go fast is creating open channels of communication and self organising and empowered teams.

If an organisation can’t create an excellent environment for communicating then no agile process will help. Agile helps teams go faster by eliminating the unnecessary documentation and waterfall steps. However, this information transfer must still happen and it happens through closer communication and collaboration.

Sadly, many organisations create agile teams and give them a process to follow but then insist on telling them how to organise, what tools and techniques to use, how to work and exactly what to do. This isn’t agile, it’s just another way of organising a traditional team. If you want agile to go fast then the team need total control over how they work and what they do.

To get back on track from here, relax on the process. Work on increasing communications. Give the agile teams the chance to decide how they will organise and work. Give them control and they will go faster. Agile is not a process, it’s about letting people get the job done.

Using The Wrong Technologies

So many agile projects struggle because they are using the wrong technologies. When this is the case it’s usually because the technology approach has been foisted on the team by an ‘ivory-tower’ architect or some senior manager who was wooed by the sales consultant from a large vendor. In other cases it may be that the team are forced into using a ‘corporate standard’ technology set.

In many cases the team will repeatedly identify the technology as a major factor in retrospectives. However, more often than not they will be told that this is not something that can be changed and that they have to stick with it. Why throw away hundreds of thousands or even millions on staff costs when backtracking on some poor technology choices would make so much difference.

Again, giving the teams the authority to make technology decisions is essential. Allowing technology choices to be reversed if they prove to be hindering delivery is also an important part of being agile.

Making The Architecture Too Complex

Many software systems are designed, or become, far too complex. In an agile environment this is a guaranteed way of making things go slower. Software must be kept as simple as possible so that it is easy to continually change and enhance.

If the architecture of an agile system has become so complex that it hinders development then it must be revisited and greatly simplified. Layers must be removed, interfaces reduced and code and technologies radically refactored to make everything simpler. Once that is done then the project must work all out on stopping it from getting more complex again in the future.


Only by using the right people, correctly empowered and communicating can the team have the ability to go fast and be truly agile. Only by making the correct technology choices, reversing bad technology choices and keeping everything simple can the ability to turned into real agile delivery.

Thursday, 1 December 2011

Increasing Agile Capacity

A scenario: you have a successful agile project. It’s made up of a number of small teams, each working on a separate component of the application suite. This has been working extremely well. You are capacity planning for the coming six months and you identify that one of these teams is likely to become a bottleneck. There are just too many stories that fit into their component area. How do you deal with this?

The above is something that looks likely on one of the projects that I am working on. I’ve been putting in some thinking on how this might pan out. This post documents my thoughts.

Traditional Reaction

There are typically two standard reactions to above problem: grow the team that is likely to be the bottleneck, or add an additional team to work on the component. In my experience neither of these works. Adding more people is rarely ever a good way to make a project go faster!

Growing the team

The best agile teams I have worked on have had one thing in common. They have all had between 4 and 6 devs, a QA, and a Scrum Master. As soon as the team gets any bigger than this I’ve found that the following occurs:

  • The performance gain of adding each additional dev is less each time.
  • It becomes much more difficult to gain consensus.
  • Team meetings become more long-winded and less productive.
  • Communication becomes more difficult.
  • It becomes difficult to maintain team values.
  • Code cruft (technical debt) increases.

Thus, adding additional devs and QAs to a team, either permanently or by borrowing from another team, just doesn’t work. Typically I’ve even found that the team goes slower as it has to spend more time cleaning up after itself.

Adding temporary devs (perhaps for a day or two) is, I’ve found, often worse than adding a permanent dev as there is less sense of ownership and shared team values. Working with good developers makes this less so, but I still believe it occurs more frequently than we like to admit.

Adding more teams

Having multiple teams working on a single component’s code base just doesn’t work well. I worked on one project where we had four teams working on the same code. We were tripping over each other all the time. Particular problems I have seen working in this way:

  • Communications between the teams becomes a big overhead.
  • More difficult to gain consensus on major technical decisions.
  • Scheduling work to avoid multiple pairs changing the same code is very difficult.
  • Very difficult to maintain shared values across multiple teams.
  • One team’s nice code is another team’s cruft.
  • Code cruft increases because one team is less willing to refactor another team’s code.
  • Different approaches to achieving the same implementation become more prevalent.
  • One team undoes another team’s work because they disagree with how it was done.
  • Important aspects like performance tend to slip between the cracks.
  • Productivity of the combined teams is far less than the sum of the productivity of each team working independently.

Multiple teams working on the same code base is a recipe for disaster. It results in more overhead, lower code quality and more cruft. Also, you get far less productivity gain that you would had you allowed each team to work independently on their own component.

Other Approaches

So, given that there is more work than the measured velocity of the team shows they can achieve in the time available. And, given that we don’t want to grow the team or add more teams. How do we solve the problem?

The aim is to keep small teams who can each work on an area of code that they have sole ownership of. This will give them the incentive to ensure that this component is clean, simple, maintainable and has a low level of cruft. It will also maximise the productivity of each individual team by minimising communication overhead.

I think a combination of four specific solutions are the best approach. These being: reducing waste, simplifying requirements, moving complexity and splitting components.

Reduce Waste

A good agile team should already be pretty good at reducing their waste. Retrospectives that generate actions which are then implemented go a long way towards this. A good Scrum Master who removes impediments is vital. The team will be provided with the best tools for the job.

Still, there is likely to be further waste that can be eliminated to allow the team to go faster. The first set comes from the category of unnecessary process waste. This includes things like:

  • Having to attend full meetings where there is very little need for members from the team to be present.
  • Long-winded design sessions that could be cut down with a bit more decisiveness.
  • Unnecessarily revisiting architecture and design decisions over and over again.
  • Re-enacting the same debate repeatedly because consensus wasn’t achieved.

The other set comes from giving the bottlenecked team stories to play that aren’t essential to what they are trying to deliver. This can be things like:

  • Helping ops with tracking down a problem
  • Adding additional logging of messages to an external system
  • Trying to reproduce an infrequent defect
  • Updating a build pipeline

In an ideal world, all of the above should be done by the team. However, if that team has a high volume of work to get through then these tasks can easily be divested out to teams that are perhaps not running at full capacity, allowing the team that is to maximise their throughput of important functional stories.

Simplify Requirements

Often performance of teams can be greatly hampered by having requirements that are either too complex or not clearly thought out. Ensure the backlog is groomed to contain only the most essential stories. Make sure these have been paired down to the absolute minimum set of requirements needed to fulfill the business needs.

The worst scenario is having a heavily loaded team working on features that are overly complex and time consuming. I’ve seen many cases where teams have worked on a fairly complex story only to later find that the clients uses just the core 80% of the feature, which could have been built in 20% of the time. The extra 80% of the time spent delivering that last 20% of non-essential requirement is just waste.

Analysts and the business need to scrutinise the backlog, squeezing every unnecessary piece of work from the stories. If the business doesn’t need some small aspect right now then create a separate story and play it later when the team has less critical path work.

Move complexity

In most large software systems it is possible to locate complexity in different components. For example table paging could be implemented in the server code or in javascript on the browser. If complexity in one place is causing capacity problems then it may be possible to move elements of this complexity to another team that has more spare capacity.

This may not always be the most technically pure solution, but it may be the best trade-off in order to deliver a product on time and budget. The complexity can always be relocated in the future.

As an example, consider a story where one component has 8 points of work do to delivery a feature and it’s two clients each have 2 points of work to consume the feature. Total 12 points. However, it might be possible to split the work differently, so that the core component implements something much simpler for 3 points, while the two clients take on some complexity and implement 5 points each. Total 13 points. So, the two approaches are roughly equivalent in size. The second might result in some duplication on behalf of two teams, but this allows the team with a large backlog to complete more stories. A pragmatic trade-off.

Split Components

If a team has multiple components, then the logical option is to relocate one or more of those components to another team. What if they only have one component?

Ideally, buy reducing waste, simplifying requirements, and moving complexity it should be possible to shrink the size of the backlog for a component. Hopefully the smaller backlog should be sufficiently sized that the team can complete it. What if they still can’t?

To me this seems to be a problem of decomposition. A component that is so large and complex that a team of six devs can’t maintain and enhance it is a component that is too big. In this case it should be split into two or more smaller components, with the current team keeping one part and a different team taking the other part(s).

Making the split is always technically challenging, but provided it is made across a clear interface boundary then my experience is that it is usually possible divide a component up into smaller constituent parts.

This is probably the only way that I would recommend going about adding more people to a project - introduce a new team (or repurpose an existing team) and give them their own code base and component(s) to work on.

Wednesday, 31 August 2011

Technical Investment vs Technical Debt

A subject that has been bothering me for a while is the concept of Technical Debt. It’s an interesting analogy, but I think it has become increasingly misused and misunderstood in the agile world. In this post I want to focus on the real meaning of Technical Debt and describe an alternative approach that worked on a current project.

What is Technical Debt?

In its simplest form, Technical Debt is work that you really should be doing but which you put off until later in order to meet some short-term delivery goal - it’s a compromise! For example, I might know that my JSON to Domain Object mapping approach is sub-optimal bit I decide to live with that for a while in order to complete a set of urgent features required for an important customer demo.

The key part of Technical Debt is that you MUST pay it back at some point in the future; and the sooner you do the better. To continue my example: as soon as the customer demo is complete, the fixing of the mapping approach should be prioritised as an urgent task.

How is it Misused?

One of the main problems I have encountered on many projects is that they misuse Technical Debt. The two most common misuses are:

  • Being far too willing to accept Technical Debt; and
  • Allowing Technical Debt to exist for too long (i.e. not paying it back quick enough)

Both of the above burden a project and, in my experience, they are allowed to happen because people don’t understand the true implications of Technical Debt correctly. There seems to be a general miscomprehension that Technical Debt can be captured as a story in the backlog that can be played at some time in the future much like any other story.

What I believe that most projects miss is the fact that having a Technical Debt story in the backlog not only requires that the debt is paid back in the future, but that its mere presence incurs an ongoing interest payment on the project. This interest payment comes in many different forms, some of which include:

  • increased difficulty understanding the code base
  • unnecessary complexity in the code
  • more difficult and time consuming refactoring
  • needing to write more code than necessary to add new features
  • slower build and test times

All of the above (and other forms) result in one major impact: reduced team velocity. So, any Technical Debt, besides being a story on the backlog that has to be played in the future, also reduces velocity. Too much of it and velocity grinds to a halt.

Cumulative Impact

Projects that tend to allow Technical Debt to be readily created and to persist also tend to allow multiple pieces of Technical Debt to be present at the same time. This has a cumulative effect in that features are built on one piece of debt and then new debt grows on these features and so on. After a while the ongoing interest payments increase exponentially and the effort required to repay each piece of Technical Debt increases significantly.

At this point a project tends to come to a halt completely because the interest payments of having the Technical Debts stop the project adding any new features, while the effort required to pay back the debt has become too huge. The project either fails or needs a reboot.

Is There An Alternative?

From time to time, any project must accept some compromise in order to meet some critical goal. I see no problem with this. However, what projects need to do is to ensure that these compromises are kept as small as possible and have the smallest possible payback cost. So, how do we ensure this? The solution I would propose is what I have coined as ‘Technical Investment’.

Using the debt/investment analogy for personal finances, we can see two approaches: I can borrow a load of money to buy what I need now and then have to deal with interest payments until I can pay the debt back; or, I can put some money away into an investment so that when I need to buy something I can do so without having to go into debt. I temporarily reduce the size of my investment to make the purchase but then I quickly replenish it and grow it again ready for another future purchase. Hopefully my investment also grows over time so I can buy more things or reduce my investment portfolio by less each time.

So, how does this Technical Investment work in agile software development? What we do is we dedicate a small portion of the team during each iteration to refactoring, cleaning, rewriting, upgrading libraries and so on. This may be in any area of the code, not just that directly touched by the current stories in play. We invest in the code base a small amount each iteration. Perhaps we might deliver one small story or feature less each sprint, but as the project progresses we avoid the large reductions of velocity that are inherent in a Technical Debt driven model.

So, Does It Work?

On a recent project we adopted the above approach (although somewhat informally, which is why I wanted to document it more formally in this post). We had a team of five developers working on weekly sprints. Each day we created two pairs to work on features, while the fifth team member was left free to invest in the code base. The lone person changed each day or so. What did we find?

Firstly we found that the need to incur Technical Debt (or draw down from our investment, to follow the analogy) was significantly reduced. Quite often the areas where we would have had to make a compromise to meet a sprint goal were already addressed and improved before making the compromise became necessary. We were able to preempt many areas of improvement before they became an issue.

Secondly, we found that in cases where a compromise was made (where we drew down from our investment) that we were able to quickly fix the compromise and get back to adding to our investment much sooner. We also avoided the problem of any cumulative compromises, because payback was smaller, which made correcting individual cases much simpler when we decided to accept them.

By working in this way we were able to have a continually improving code base, while still maintaining a high velocity of new features. The code base continually improved in quality and clarity throughout the project even though features were continually being added.

But Shouldn’t This Happen Anyway?

This is an interesting question. Yes, a good agile team should be continually refactoring and improving code as part of every story. However in practice, the pressure to complete features often reduces the amount of improvement that is done. It’s also often difficult to justify changes to code in an area that no-one is currently working on just because it needs some love: which may benefit some unknown work in the future.

Having a concept called ‘Technical Investment’ also gives a concrete thing that can be talked about with Product Owners. We can discuss the investments made during reviews and present them in a positive way, something that I have found much more difficult to do with debt.

I suspect that it may also be possible to measure and visualise the investment in a similar way to the measuring of velocity. This is certainly something I’d like to explore in the future as being able to show how investing in the code reduces future reductions in velocity is a great way to justify the practice.

Conclusion

Keeping the code base clean and building up good quality through continual Technical Investment on each iteration has many advantages over the use of Technical Debt to capture and deal with compromises. When applied, the need to compromise becomes less and the effort involved in fixing each compromise is significantly reduced. The chances of building up cumulative, velocity zapping compromises also lessens significantly. If you have a longer-running or larger project then continual Technical Investment is the only sure way to make sure the project doesn’t grind to a halt due to debt interest as some time in the future.

Wednesday, 29 September 2010

Simple and Elegant

One of the most common traits that I come across in us software developers is the tendency to over-engineer our code. We try to future-proof our code and we try to make it deal with scenarios  that may never even be a requirement for the system we are building. Recognising when this is happening and being able to create a simpler and more elegant solution is something we should all be striving towards.

As an example, I'm currently using some of my personal time to build a solution for classifying large amounts of information (more about this in a future post). I'm currently undertaking a TDD exploration of the core domain model. One of the requirements that I have identified is the ability for a user to define a set of properties that can be held against each piece of information. Each property has a name that maps to a value - a fairly simple concept.

As I was writing the test cases and domain classes for this requirement I drifted down a route of allowing typed property values. Thus, rather than just String values, they could be Int, Boolean, ThingaMaBob or whatever you want them to be. However, definitions of properties and assignment of values are managed via a user interface rather than in compiled code so this solution started to grow very complex as it dropped into a world of runtime type validations and conversions and so forth. 

As I wrote more and more code the solution began to smell more and more like over engineering (when you start needing Scala Manifests in a domain model you know something isn't quite right). I could see myself getting bogged down in getting this working, so I decided to take a step back and look at the requirement again. Was I sure that I would actually need typed property values? No, maybe in future but not for any specific cases I could currently identify. Was having typed property values allowing me to get a greater understanding of my domain model? No. Was the requirement for typed property values a valid one, or just an excuse for over engineering? The ultimate conclusion was that I could actually do everything I wanted for the foreseeable future with simple String values and some basic validation rules.

With my new found simplification in hand I dumped a whole load of complex code and ended up with a very simple, very elegant solution that works perfectly for my current needs.

Sadly, I all too often see developers go down this same route but fail to realise that they are over engineering. They then spend an excessive amount of time building a solution that is fragile, difficult to test and unresponsive to changes in requirements that might be different to those they originally imagined when building their solution. These over engineered solutions just contribute to the technical debt of projects that allow them to exist.

Always aim for the simplest and most elegant solution that meets the current set of requirements - nothing more, nothing less. Don't over engineer and don't try to predict future requirements. Note the emphasis on elegant: just because something is very simple doesn't mean it is a good solution. A simple solution can still be built from messy, poorly structured code that is just as difficult to maintain and enhance as its complex counterpart.

If we all focus on this goal of simple, elegant code then software becomes simpler, easier to understand and much easier to maintain and enhance. This then benefits us all through increased productivity and improved ability to deliver.

Thursday, 5 August 2010

The Value of Hardening

In my last post I looked at projects suffering with large amounts of technical debt and ever slowing velocities. One solution that one of these projects put forward was to undertake one (or perhaps more) hardening sprints. In these sprints, all teams would stop development of new functionality and focus on two things:
  • Fixing as many of the outstanding defects as possible
  • Addressing and improving the areas of the code that exhibit the largest clusters of defects
I want to question the validity of this approach as I think it offers very little value and doesn't solve the longer term problems associated with technical debt and reduced productivity.

Firstly, all code will contain some defects. Even the best code created using TDD principles will still have the occasional defect. These sort of defects can be easily addressed in the normal sprint mechanism - just get the business to prioritise them correctly along with the user stories and they will get resolved. No need to a dedicated sprint to fix these.

Secondly, we look at the defect clusters. The problem comes with trying to fix defect clusters and improve the code in a single hardening sprint. My feeling is that this is just a papering over the cracks, which, while perhaps offering some quick wins, fails to address the underlying causes of those cracks.

In most applications, defect clusters occur for one of two key reasons:
  • The product has been crammed with too many features without sufficient refactoring of the architecture and code. The net result is that the code is now too complex, poorly structured and difficult to maintain. Adding new features is significantly more likely to break other features that were working.
  • An initial rough architecture and code base was rushed through to meet a deadline and has not been sufficiently refactored prior to trying to scale it up - resulting in poor performance and reliability.
In the first case, trying to fix defects doesn't resolve the underlying complexity issues. In fact, fixing one defect is significantly likely to introduce other defects - especially if the automated test are lacking (common in projects that have reached this state).

Additionally, trying to make smaller fixes and refactorings to this complex code initially results in less stability and higher defect discovery rates. Given the aim of a hardening sprint is to make the product more stable and bullet-proof, these refactorings and small improvements actually can have a negative effect on quality in the short term.

In the second case, trying to address performance and stability in a single sprint just won't work. Achieving highly reliable and performant code can only be met through an in-grained philosophy in the project. All code must be well written, well tested and proved performant as part of its development. Taking some existing code and trying to tweak it to make it so is largely a futile effort.

Given the above, there seems little value to a hardening sprint (or sprints). A much better approach would be to correctly plan out technical debt into a number of DETAILED stories. These should address reducing the complexity of architecture and code in a structured way, refactoring code in a more structured way, improving the thinking about scalability and improving project focus and processes to increase quality, reliability and performance of architectures and code. The business should then be forced to prioritise these above new functionality for inclusion in the ordinary sprint process.

This approach prevents the short-term, quick fix mentality of hardening sprints. These sprints consume large amounts of resource, produce only surface improvements and leave all the fundamental problems intact, while at the same time fooling the business into thinking that things are improving. Never a good combination.

Tuesday, 3 August 2010

Drowning in the Technical Debt Mountain

Over the last few years I’ve worked on a number of Agile projects that have stumbled into problems. Looking back, all of these projects have had similar characteristics. Namely:
  1. They were all long-term strategic projects vital to the success of the company building them
  2. They were all long-running projects with at least 18 months development behind them
The problem that each of these projects encountered was that over time it became increasingly more difficult and time consuming to add new features to the products. The number of bugs and issues slowly rose and each time they would take longer to fix. Early in the project, teams had velocities measured in tens of points, but these gradually reduced until single digit velocities were the norm. Why does this happen?
Taking a broad look across these projects highlights a number of problems that they all had in common:
Build Up of Technical Debt
Probably the most critical problem was that each of the projects had allowed Technical Debt to build up. They had all started well with good intentions and with emergent architectures. However, in the rush to get new features in, they neglected the continuous architectural improvement needed. Releases went out with rushed development and the intention to ‘go back and fix that’, but the business pressure to add new functionality always won over technical improvement.
Over time the interest on the technical debt builds up and you spend so long servicing it that velocity drops. You then end up in a death spiral catch-22 situation: you can’t add new functionality without extensive time and the addition of many new defects but you can’t just stop adding functionality and re-write major portions of a critical product that is already live.

Too Much Focus on Frameworks
Another thing that I noticed about all these projects is that they spent a significant amount of time early on developing ‘frameworks’ and aiming to ‘develop for reuse’. This just wouldn’t happen on a short-duration project.
Unfortunately, building smart solutions in this way just doesn’t work in an agile world. Firstly, you just can’t fully know all the features the framework will require in advance. You therefore try to preempt future requirements which at best results in unnecessary work. At worst (and usually most common) you end up building a framework that forces a way of working that you constantly have to shoe-horn future work into.
Asking the business to fund a major rework of a core framework mid or late in the project usually results in some very hard business questions, so development teams limp on with an increasingly complex and not-fit-for-purpose solution - which is ultimately the source of much of the technical debt build up.

Building Depth Before Width
Another problem that all these projects encountered is that they aimed to build one component of the system to completion rather than focusing broadly across the whole architecture. Thus, they spent a lot of time building some really cool features into one part of the product but then had to rush other parts when that time started to run out.
The net result of this approach is that you get architectural complexity building up in one area and insufficient architectural development in others. Ultimately you hit a number of problems such as scalability and reliability issues in the areas where not enough time was spent and maintainability issues in the areas where too much time was spent and too much complexity was added. All of these issues add to the burden of technical debt.
So, how do we avoid these problems happening? There are a number of key things that you need to do:
  1. Build and Architectural Straw-Man: The first thing that a long-running agile project must do is spend a sprint (or three) building a broad architectural straw-man that addresses the full breadth of the architecture. Focus on the smallest possible number of key features that touch the entire product without adding too much depth
  2. Prove the Straw-Man: Make sure that the architectural straw-man is proven in terms of scalability, reliability and performance. It should have plenty to spare in all areas. Ideally tests for these non-functional areas should be automated so that they can be repeated as each new feature is added.
  3. Focus the Business on Critical Features: Often the business gets focused on trying to build something that is feature complete in one area. Make sure they don’t do this. Instead get them to focus on what is most important across the entire product. Build breadth of functionality rather than depth in just one area. Avoid at all costs release plans that focus on just one component of the solution.
  4. Don’t Build Frameworks!: There’s absolutely no point in building any frameworks or coding specifically for re-use. It just doesn’t work. Instead, just work on the straw-man and then on adding new features. When a new feature overlaps with something already existing then refactor out the duplication - do nothing more than that! Let the frameworks evolve and emerge through this process of refactoring out duplication, don’t try to preempt what might be needed.
  5. Continuously Validate the Architecture: Each new feature added to a product might have required some architectural change, might have required refactoring out of duplication or might even have added a new component. The key is that the development of each new feature should include work to validate that the scalability, reliability and performance have not been compromised. There should also be time available to improve the architecture before moving onto the next feature.
By starting with an architecture that is sound and leaving it in a sound state at the end of every feature addition you avoid the build up of technical debt. Many would argue that this slows down delivery of feature releases and the addition of new functionality. This may be true, but for a long-term strategic project the benefits of continued future productivity outweigh this many times. Also, avoiding building frameworks and minimising initial complexity often saves so much time that initial releases come in quicker anyway.
One question remains, how do we save any of the projects that I looked at that are already drowning under their mountains of technical debt? There’s no easy solution to this question - often cancelling the project may be the best answer. However, where that’s not feasible then hare’s some ideas that I’d like to explore further:
  • Strip out existing complexity - find the main areas of the project that are too complex and thus have high defect rates and which are difficult to maintain. Remove features and complexity from them until they become simple enough to fix and refactor. While this might not be popular with the business, a product that works and that can be maintained and enhanced is much better than one packed with features but which is non-functional and costs a fortune to maintain.
  • Move beyond exiting architecture - accept that what went before is perhaps beyond saving. Start out with a new architectural straw-man that avoids fancy frameworks and is proven scalable, reliable and performant. Build all new functionality against this architecture and gradually migrate existing functionality to it. Prove the architecture and refactor for EVERY feature.
  • Write-off all existing technical debt. NEVER let technical debt build up again
  • Re-prioritise - work with the Product Owner to re-prioritise the backlog to focus on building the broadest set of essential features first from now on rather than trying to add every bell and whistle from the start.
  • Shoot any developer on the team who still thinks that building re-usable frameworks was a good idea - seriously!